Canteen Formation Works & Locker Room Refurbishment

The project:

Background:

We were invited to the site to meet with our existing client regarding the creation, upgrade and refurbishment of the staff welfare facilities. This invitation followed the successful completion of various other projects at the property, including the refurbishment, supply, and installation of additional changing facilities within the facility.

The project was completed in early 2024, demonstrating our commitment to delivering high-quality results. We continue to support this valued client across their estate, building on a strong relationship and ensuring their ongoing needs are met with excellence.

Scope of works:

Canteen Transformation:

  • Strip-out and Removals: Complete preparation of the former meeting room.
  • Flooring Installation: Installation of robust contract flooring.
  • Ceiling Installation: Installation of professional suspended ceilings.
  • Bespoke Kitchen Installation: Supply and installation of a kitchen tailored to client specifications with robust appliances.
  • Decorating Works: Enhancing the overall aesthetic for a welcoming environment.

Locker Room Refurbishment:

  • Flooring Installation: Installation of durable contract flooring.
  • Ceiling Installation: Installation of suspended ceilings for operational requirements.
  • Decorating Works: Selection and application of practical and visually appealing materials.
  • Bespoke Lighting and Electrical System: Design and implementation for energy efficiency and functionality.

General Project Execution:

  • In-house Operatives: All works completed by skilled in-house tradespeople.
  • Robust Product Selection: Focus on durable materials and finishes.
  • Quality Workmanship: High attention to detail and seamless execution.
  • Cost-Effective Solutions: Contractor-designed solutions meeting client expectations.
  • Modernisation: Transformation of spaces into efficient, modern environments.

Challenges:

The challenges faced on this project were diverse and required a tailored approach to ensure successful delivery. Operating within a live manufacturing environment posed logistical difficulties, as the client’s priority shipping schedule often limited the flexibility of material deliveries and loading. Additionally, changes in project scope added complexity.

To address these challenges, we implemented a stakeholder-focused approach that considered the needs of building users, visitors, and operational staff. We carefully managed space and worked outside regular hours, starting as early as 6 a.m., to align with the client’s logistics schedule and minimise disruption. By selecting the most appropriate tools and techniques, we further reduced noise and interference with manufacturing operations.

Throughout the project, our in-house operatives and supply chain partners upheld professionalism, remaining easily identifiable with branded PPE and ID cards. Our adaptable approach and attention to detail enabled us to deliver high-quality results despite the complex and dynamic conditions for such a small yet complex project.