Skip links

Leading Biotech Toward a Greener Future

The Client

Merck Group, Glasgow site. This site is internationally recognised for its biosafety excellence within the biotech and pharmaceuticals industries.

The Project Brief

The brief was to design and install a major Solar PV (Photovoltaic) system at Merck’s Glasgow facility to help the global leader move toward a greener future and demonstrate a shared commitment to sustainability. Due to the nature of the client’s industry, the project required adherence to the highest levels of compliance and quality.

Scope of Works:

  • Solar PV Installation: Execution of a major, large-scale Solar PV system installation.
  • Fully Integrated Management: Utilising Lochlie’s fully integrated, multi-trade teams to manage the entire process, ensuring quality control and dependable scheduling.
  • Compliance & Quality Assurance: Maintaining the highest standards of compliance, essential for a site focused on biosafety excellence in biotech and pharmaceuticals.
  • Technology Integration: Leveraging Lochlie’s position as a ‘tech disruptor’ to deliver optimal, data-driven PV performance.

The Results

The project was completed successfully, resulting in a major Solar PV installation for the Merck Group in Glasgow.

  • Operational Excellence: The project upheld the client’s rigorous standards, demonstrating Lochlie’s dedication to compliance and quality within complex industrial settings.
  • Sustainability Achievement: The new solar install directly contributes to Merck’s environmental goals, supporting their transition toward a greener operation.
  • Long-term Value: The outcome reflects the goal of “building things that last,” delivering not just critical infrastructure but also fostering a sustainable relationship that drives a more sustainable Scotland.


Ready to join global leaders like Merck in building a more sustainable future?

Contact us today to discuss how our fully integrated, data-driven Solar PV solutions can optimise performance and ensure compliance for your commercial property.

  • 0141 212 0000
  • info@lochlie.co.uk

Please note: Lochlie Construction will close for the festive break on Friday 19th December 2025 at 4pm and re-open Monday 5th January 2026 at 8.30am. 

X